Planned properly. Fitted carefully. Signed off together.
Every scheme runs through the same six stages, with the same people accountable from start to finish. This page also covers the health and safety and standards information that tenders ask for.
Six stages, one team.
The bars show how the stages overlap on a typical scheme. The dates come from your programme. The order stays the same.
- 01Pre-start and resident liaisonProgramme agreed, letters out, appointments booked.
- 02Survey and specificationEvery opening measured and checked.
- 03Manufacture and deliveryMade to measure, delivered in programme order.
- 04InstallationFitted, sealed and made good, home by home.
- 05Inspection and handoverChecked together, snags closed, paperwork issued.
- 06AftercareA named contact for anything that comes up.
What happens at each stage.
You have one contracts manager throughout. They agree the programme with you, run the job and sign it off with you.
Pre-start and resident liaison
We agree the programme, access and site rules with you. Residents and building users get a letter that explains what's happening and when, with a number to call.
Survey and specification
A surveyor measures every opening and checks the specification. You approve the window schedule before anything is made.
Manufacture and delivery
Windows are made to measure and delivered in programme order, so materials aren't sitting on site for longer than they need to.
Installation
Each window is removed, replaced, sealed and made good in one visit. A supervisor is on site throughout, and you get regular progress reports.
Inspection and handover
We check every window ourselves first. Then we walk the job with you, close any snags and hand over certificates and guarantees.
Aftercare
Residents and building managers have a named contact for any problem after we've left site.

Working where people live and work.
A window can only be replaced from inside someone's home, classroom or office. How we behave there matters as much as how we fit.
- Appointments kept, with a call ahead if anything changes
- ID badges worn and shown at every door
- Floors and furniture covered before any work starts
- Rooms vacuumed and wiped down before we leave
- No home left unsecured overnight

Health and safety.
Replacing windows means working at height, handling glass and working around the public. Every job is planned so that our people go home safe and nobody else is put at risk.
- Risk assessments and method statements written for each site
- Site inductions and regular toolbox talks
- Scaffolding and access equipment put up and inspected by competent people
- Asbestos information checked before any work starts
- Our duties under the CDM Regulations 2015 planned for from tender stage
Standards and compliance.
Replacing windows is controlled work under the Building Regulations. We check every specification against the parts that apply before anything is made.
| Area | What we check | Approved Document |
|---|---|---|
| Energy efficiency | Window and door U-values or energy ratings meet the current limits. | Part L |
| Ventilation | Background ventilation, usually trickle vents, is provided where the regulations require it. | Part F |
| Fire safety | Escape windows keep the clear opening they need, and the new windows are no worse for fire safety than the ones they replace. | Part B |
| Safety glazing | Toughened or laminated glass in doors, low-level glazing and other critical locations. | Part K |
| Protection from falling | Guarding or opening restrictors where a window with a low sill is above ground level. | Part K |
| Security | Locks and hardware to the standard your tender sets, such as PAS 24. | Part Q (new homes) |
Approved Documents apply in England. Replacement windows in homes are certified through a competent person scheme or signed off by building control.
Tender documents.
Tell us what your tender or pre-qualification questionnaire asks for, and we'll send the insurance, health and safety and accreditation documents it needs.
Company details for tender forms are on the About page.

We don't call it finished until you do.
Handover means a joint inspection, a closed snag list and a pack with everything your asset team needs.
- A joint inspection with your surveyor or clerk of works
- Snags agreed, closed and recorded
- Certificates, guarantees and operating instructions
- An as-fitted window schedule for your asset records